IDEA #3RKMX7 Semi precast method of construction of multi-storey buildings

A method of construction of multi-storey buildings using precast faGade and precast floor panels to eliminate water seepage, without the use of sealants, between the faGade panels and superstructure of the building by eliminating all external joints between the faGade and superstructure. The faGade 1 is installed on the superstructure before structural cross walls 2 are cast. The cross walls 2 are cast to embed the edges of the faGade 1. The faGade 1 is supported and held in place by the cross walls 2. Brackets 6 are provided on the sides of the faGade which interconnect with brackets of the faGade above. The interconnected brackets are embedded in the cross walls 2. Reinforced precast slabs 3 are laid on top of the cross walls 2 and act as formwork thereby minimizing the need for internal framework. Reinforced concrete is then laid on top of the precast slabs 3 to cast the floor of the unit above.